Talleres Maximiliano Achieves Successful ASME U-Stamp Re-Certification
We are proud to announce that Talleres Maximiliano has successfully passed the…
We are proud to announce that Talleres Maximiliano has successfully passed the…
Another example of collaboration between two great companies. Evaporation Plant Designed by…
CIP plant manufactured by Talleres Maximiliano for our client HRS Heat Exchangers,…
Talleres Maximiliano continues to expand its product catalog with the ASME U…
Talleres Maximiliano has completed its first equipment’s U-Stamp bound for the United…
Talleres Maximiliano completes the construction of six medium size heat exchangers for…
After our recently ASME Certification, Talleres Maximiliano have closed the construction of…
Finished the construction and assembly of an apple sauce plant with destination…
A gas dehumidification plant for Australia were successfully delivered in 2022. The…
Talleres Maximiliano has built and delivered a 2k, 2.5k 5k & 10k…
Talleres Maximiliano successfully delivered a plant for the food sector to the…
Talleres Maximiliano obtains the ASME U Stamp Certification for the manufacture of…
Plant and equipment completely built and assembled in Talleres Maximiliano, including FAT…