Construction of a sludge pasteurization plant
Plant and equipment completely built and assembled in Talleres Maximiliano, including FAT tests.
Plant and equipment completely built and assembled in Talleres Maximiliano, including FAT tests.
Talleres Maximiliano obtains the ASME U Stamp Certification for the manufacture of pressure vessels according to ASME Section VIII Div.1
Talleres Maximiliano successfully delivered a plant for the food sector to the Côte d’Ivoire in 2022. A plant completely built in the facilities of Talleres Maximiliano in Ceutí (Murcia), Spain.
Talleres Maximiliano has built and delivered a 2k, 2.5k 5k & 10k m³ portable seawater desalination plant for North Africa. It was entirely built and assembled in the Ceutí workshops in Murcia, Spain.
A gas dehumidification plant for Australia were successfully delivered in 2022. The construction and assembly was carried out entirely at Talleres Maximiliano.
Finished the construction and assembly of an apple sauce plant with destination USA, including FAT test.
After our recently ASME Certification, Talleres Maximiliano have closed the construction of 32 U-Stamp Items.
Talleres Maximiliano completes the construction of six medium size heat exchangers for food sector with destination North Europe.
Talleres Maximiliano has completed its first equipment’s U-Stamp bound for the United States of America. Thanks to our team, which has allowed the achievement of this milestone in a record time.